CSAH22 Weekly Update from Bolton & Menk:
The contractor successfully completed Stage 1C and 2B last week and a milestone was acknowledged by the reopening of Ferry St and South 4th St. These roadways are planned to remain open for the remainder of the project. All work has been completed in these areas with exception of any repair work and the final lift of bituminous pavement which will be completed next summer.
The contractor successfully completed the installation of the new retaining walls on Bridge St. last week. Immediately following, crews started with the new concrete sidewalk and all concrete work on Bridge St. is expected to be completed this week. The installation of the new sod is expected to be completed by the end of next week. Following the successful completion of the sod, the final operation is the placement of the middle lift of bituminous pavement and then Bridge St. can be reopened on or before Friday, 9/18.
The contractor was able the complete the installation of the new roadway sand and aggregate base on Elmwood Ave. up to Turril St. last week. The contractor has subcut up to Kaukis Dr. and is monitoring closely to make sure the soil is dry enough to continue working after the recent rain event(s). The contractor plans to continue with the roadway work heading south towards LaBelle’s over the next week.
Lastly, the Contractor’s schedule shows the continuation of the new concrete curb and gutter on Elmwood Ave. heading south of Inner Drive is about 1.5 weeks out.
Original source can be found here.
Source: City Of Le Sueur